The money is running out halfway through
A frozen project means money buried in the ground.
"Preliminary Study" Package · €100
For the project: House design in the village of Breste — detailed bill of quantities + anonymized architectural drawings of a completed project with the same specifications. 100% of the amount will be credited toward your project if you become our client.
The problem
Starting a project without knowing the exact costs is like driving a car with your eyes closed.
A frozen project means money buried in the ground.
Without a construction supervisor, three contractors submit three distinct bids.
For a €120,000 project, a 25% margin amounts to a €30,000 difference.
The Decision
For €100, you get the tools you need to make an informed decision.
A detailed breakdown of materials and labor based on a completed project.
Anonymized detailed drawings of a specific completed project, so you can see EXACTLY what you’ll get.
Specifically
Construction work, materials, and installations—all with quantities and measurements. Based on the specific reference project.
Before making a financial commitment.
Three contractors are providing cost estimates for the same items.
You can see the scope and quality of documentation you can expect if you work with us.
An architect will review the construction drawings with you before signing.
The entire amount is deducted. Your final price: €0.
How it works
Enter your email address and pay €100 via myPOS—it takes just 2 minutes.
You'll immediately receive a secure download link in your email.
You are reviewing the technical specifications and drawings.
If you continue — a €100 credit. If not — no strings attached.
Results
A detailed code review catches errors before they become costly.
up to €30,000You know in advance whether this house is within your budget. A clear “yes” or “no.”
100%One bid, many contractors—they all provide quotes for the same items, so you can choose the best one.
3–5 offersA clear picture of the time and financial commitment—no mid-project surprises or last-minute dips into your savings.
0 surprisesAbout Us
I bought the package before the project started. It saved me three months of running around to find contractors.
The construction estimate was so detailed that I received four bids from contractors—the difference between them was €22,000. Without that document, there was no way for me to know which one was accurate.
I decided not to build that particular house after seeing the breakdown—and it was the best €100 investment of the year. I saved myself a €150,000 mistake.
Price
How often do you pay a €100 fee that is refunded to you?
House design in the village of Breste · ID 988 · Total floor area 171 m²
If you become our customer, your package is free.
Get the package nowQuestions
The download link will be sent to your email.
Yes. Payments are processed through myPOS—a licensed payment service provider that meets all European security standards (PCI DSS Level 1). ISPDD does not store any card data.
By clicking, you agree to the terms. We do not share your email address.